banner
Home » Products »

Titanium Bicycle Dropouts

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-03 13:04

  • Browse the number:

    232

Send an inquiries
Company Profile
HONG KONG ADVANCED TITANIUM GROUP LIMITED
By certification [File Integrity]
Contact:

shitai(Mr.)  

Email:

Telephone:

Phone:

Area:

Guangdong

Address:

3F, Unit B, Gangzhilong Science Park, Qinglong Road, Longhua District, Shenzhen, China

Website: http://www.advanced-titanium.com/ http://shitai.ukbetterjobs.com/
Product details

Equipped with a professional factory, it is one of the competitive titanium bicycle dropouts manufacturers and suppliers, welcome to order titanium bike dropouts through our website.

一、Product name:titanium bicycle dropouts


二、Specification:

1. Material: GR5 Titanium,TC4 Titanium

2. Technics: Lost wax casting, CNC machining

3. Surface finish: Polishing(mirror), sandblasting

4. Surface roughness: Ra 1.6 

5. Casting minimum tolerance: +/-0.1mm

6. CNC minimum tolerance: +/-0.01mm

7. Inspection: Slide caliper, microcaliper, projector, 100%

8. Certification: ISO9001:2008

9. Package: Cartons

10.OEM Service: We can produce it according to your drawings or samples.

11.Application: Bicycle parts

 

三、Products show:

Quality control:

1. Before confirming the order, material and color should be check strictly through sample

2. Quality will be controlled from the beginning to the end.

3. Every  parts will be checked and cleaned before packing into the carton

4. Before shipping ,the clients could send a QC or point to the third party to check the quality.


四.Packing and Shipping

Why it takes about 30-35 days to produce?

Firstly, we should check your drawings  many times to ensure the accuracy.

Secondly, the critical step—— mould-making takes about two weeks to ensure it totaly match your drawings.

Thirdly, the wax pattern  takes about 2-3 days to make sure it strictly  conformance to the mould.

Forthly, the shell making and  the after steps are takes about two weeks, in the shell making processing, we should  cooling and roasting over and over again to ensure the high strength of it.

Finally, it takes several days to make the quality inspection and some final treatment.

In a word, all of the steps are key to the products, we make sure to keep the high quality of your items.


五、Processing flow and business flow:

Processing flow

Business flow

六、 Company imaging



七、patent and certification


八、Products Application& Our Advantages