Titanium Bicycle Dropouts
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Guangdong
- Validity to:
Long-term effective
- Last update:
2017-07-03 13:04
- Browse the number:
232
- HONG KONG ADVANCED TITANIUM GROUP LIMITED By certification [File Integrity]
-
Contact:
shitai(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Guangdong
-
Address:
3F, Unit B, Gangzhilong Science Park, Qinglong Road, Longhua District, Shenzhen, China
- Website: http://www.advanced-titanium.com/ http://shitai.ukbetterjobs.com/
Product details
Equipped with a professional factory, it is one of the competitive titanium bicycle dropouts manufacturers and suppliers, welcome to order titanium bike dropouts through our website.
一、Product name:titanium bicycle dropouts
二、Specification:
1. Material: GR5 Titanium,TC4 Titanium
2. Technics: Lost wax casting, CNC machining
3. Surface finish: Polishing(mirror), sandblasting
4. Surface roughness: Ra 1.6
5. Casting minimum tolerance: +/-0.1mm
6. CNC minimum tolerance: +/-0.01mm
7. Inspection: Slide caliper, microcaliper, projector, 100%
8. Certification: ISO9001:2008
9. Package: Cartons
10.OEM Service: We can produce it according to your drawings or samples.
11.Application: Bicycle parts
三、Products show:
Quality control:
1. Before confirming the order, material and color should be check strictly through sample
2. Quality will be controlled from the beginning to the end.
3. Every parts will be checked and cleaned before packing into the carton
4. Before shipping ,the clients could send a QC or point to the third party to check the quality.
四.Packing and Shipping
Why it takes about 30-35 days to produce?
Firstly, we should check your drawings many times to ensure the accuracy.
Secondly, the critical step—— mould-making takes about two weeks to ensure it totaly match your drawings.
Thirdly, the wax pattern takes about 2-3 days to make sure it strictly conformance to the mould.
Forthly, the shell making and the after steps are takes about two weeks, in the shell making processing, we should cooling and roasting over and over again to ensure the high strength of it.
Finally, it takes several days to make the quality inspection and some final treatment.
In a word, all of the steps are key to the products, we make sure to keep the high quality of your items.
五、Processing flow and business flow:
Processing flow
Business flow
六、 Company imaging
七、patent and certification
八、Products Application& Our Advantages
-
Solar Led Street Light with Pole
price: Negotiable
-
High Carbon Steel 170 Wire Cutter
price: Negotiable
-
Manual Dosing Poultry Chicken Feed Making Line
price: Negotiable
-
DL360 Gen10 10NVMe
price: Negotiable
-
Copper Rod Casting Machine
price: Negotiable
-
Bearing for NSK
price: Negotiable